Can I install a standby generator myself?
Not the wiring or gas work. Generac's installation guide says only a trained and licensed electrician should do the wiring, and a qualified professional should connect the fuel. It also warns that incorrect installation can void the warranty. Most homeowners hire an authorized dealer that coordinates the whole job.
Do I need a permit for a home generator?
Almost always. Generac's installation guide tells installers to contact the local inspector or city hall and secure all required permits before installing, and to follow NFPA 37, NFPA 70 (the National Electrical Code) and local codes. Rules and fees vary by city and county, so ask your building department or dealer.
How close to the house can a generator be?
Generac says its 9 to 22 kW air-cooled models can sit as close as 18 inches to the house, because of testing by Southwest Research Institute, unless local codes say otherwise. Keep 3 feet in front and at the ends, 5 feet overhead, and never put it near windows, doors or vents.
How long does a generator installation take?
Generac says the installation itself can take a matter of hours, but the full process often takes several weeks once you add dealer availability, site prep, gas line work and the permit. Ask your dealer for a written timeline that includes the inspection date.